ARTFEED — Contemporary Art Intelligence

Philadelphia's Green Corridor Projects Aim to Boost Walkability and Connectivity

architecture-design · 2026-09-28

Philadelphia is pushing forward with green corridor initiatives to improve pedestrian accessibility. The AveArts 2.0 project, costing $150 million, is set to revamp South Broad Street from City Hall to Washington Avenue, drawing inspiration from the Champs-Élysées. Phase 1A launched in June to trial design ideas. Gensler's Oliver Schaper highlighted the need for a versatile approach to the corridor. Carl Dranoff described it as a crucial civic opportunity. In July, a $1.85 million city grant was revealed for the Market East Revival project, supplemented by $2.5 million in federal planning funds. The $16 million Market Street Old City Improvement Project debuted in June, while the $9.5 million Washington Avenue Connector is slated to start in April 2025. The $329 million CAP Project commenced in 2023, with an anticipated completion in 2030.

Key facts

  • AveArts 2.0 is a $150 million multiyear plan led by Gensler and OJB to transform South Broad Street (Avenue of the Arts) from City Hall to Washington Avenue, modeled after the Avenue des Champs-Élysées in Paris.
  • Phase 1A of AveArts 2.0 opened in June, testing the design vision by isolating the median as the core boulevard expression before splitting the work into two phases.
  • The Market East Revival project received a $1.85 million city grant for new bus shelters, transit headhouses, trees, murals, lighting, and plantings coordinated by the Center City District, and $2.5 million in federal grant funds released in July for planning and public engagement.
  • The $16 million Market Street Old City Improvement Project, led by Urban Engineers with landscape architecture by Ground Reconsidered, opened to the public this June after beginning construction in 2024.
  • The Washington Avenue Connector, a $9.5 million project commissioned by the Delaware River Waterfront Corporation and designed by Andropogon, started in April 2025 and is slated to open this fall.
  • Penn's Landing Park is part of the $329 million Interstate 95 Central Access Philadelphia (CAP) Project, which began construction in 2023; the highway cap is expected to be completed in 2029, with the park opening by 2030.
  • Hargreaves Jones is responsible for the site plan, grading, and green space configuration for the 11.5-acre cap park.
  • The South Street Pedestrian Bridge extension over Columbus Boulevard, part of the CAP Project and designed by Hill International, is slated to open in 2027 and will be installed overnight using trucks to roll it across the six-lane highway onto pre-installed piers.

Entities

Artists

  • Meredith Lindemon
  • Carl Dranoff
  • Oliver Schaper
  • Julie Bush
  • Cherelle L. Parker

Institutions

  • Gensler
  • OJB
  • Avenue of the Arts
  • Office of Transportation and Infrastructure Systems
  • Department of Planning and Development (DPD)
  • Center City District
  • Market East Corridor Advisory Group
  • Urban Engineers
  • Ground Reconsidered
  • Delaware River Waterfront Corporation
  • Andropogon
  • Hargreaves Jones
  • PennDOT
  • Hill International
  • TrakTeam Media
  • Meantime
  • The City of Philadelphia

Locations

  • Philadelphia
  • United States
  • Market Street
  • South Broad Street
  • Avenue of the Arts
  • City Hall
  • Washington Avenue
  • Paris
  • France
  • Center City
  • Reading Terminal Market
  • Market East
  • Old City
  • 2nd Street
  • 6th Street
  • Delaware River
  • Delaware River Trail
  • Penn's Landing Park
  • Columbus Boulevard
  • South Street Pedestrian Bridge

Sources