ARTFEED — Contemporary Art Intelligence

New Museum's OMA Expansion Leaks During Flash Floods, Closes for Weekend

institutional · 2026-07-20

Just months after reopening its $82 million OMA-designed expansion, the New Museum in Manhattan suffered a significant water leak during flash floods on July 18. Museum workers used buckets to catch water streaming into a gallery housing WangShui's work "oppose the serpent" (2024). The museum closed for the weekend due to extreme weather. No artworks were damaged. The 60,000-square-foot expansion, which doubled exhibition space, had already drawn mixed reviews, with critics noting unfinished details like masking tape on railings and exposed wiring. The leak occurred during the inaugural exhibition "New Humans: Memories of the Future," featuring over 150 artists.

Key facts

  • New Museum's expanded building leaked during flash floods on July 18
  • Water streamed into gallery housing WangShui's 'oppose the serpent' (2024)
  • Museum workers used buckets to catch water
  • No artwork was harmed
  • Museum closed for the weekend due to extreme weather
  • The $82 million OMA-designed expansion opened in March after two years of closure
  • The 60,000-square-foot expansion doubled exhibition space
  • Critics noted unfinished details like masking tape and exposed wiring

Entities

Artists

Institutions

  • New Museum
  • OMA
  • Artnews
  • Hyperallergic

Locations

  • Manhattan
  • New York City
  • Lower Manhattan

Sources